Installation Method

Precision Installation.
Seamlessly Integrated.

Effortless Installation Steps

Our concealed access covers are installed with precision and care to ensure seamless integration and long-lasting performance. Each step of the process, from preparing the base to aligning the final tile or stone finish, reflects our commitment to high-quality workmanship and attention to detail. 

Explore the steps and images below to see how our team achieves precision alignment and a flawless surface finish, every time.

Remove the old manhole cover

Perimetrically place the bolts on the base

Install the new hatch with bolts

Apply interior insulation to the interior of the hatch

Place the accessory on the water dripper

Apply exterior insulation to the hatch

The foundation of the manhole is complete

Fill with Sikaflex to prepare for marble placement

Lay the marble tile to cover the access hatch

Align the joints of the surrounding marble for a seamless installation

Place the tiles around the perimeter of the access hatch for a smooth finish

Protect the joints using masking tape

Place the grout in-between the tiling

Reapply the masking tape

Apply elastomeric material around the perimeter

Unscrew the screw that keeps the hatch closed

Insert and turn the key to open the access hatch

The manhole cover is complete and ready for use

After using the access hatch, always replace and tighten the screws

High-Quality Workmanship. Every Detail Considered.

Every Talantzis Hellas access cover is installed with meticulous care and technical accuracy.

From the first bolt to the final polish, every Talantzis Hellas installation is handled by experienced professionals.

Our meticulous approach ensures perfect alignment, watertight sealing, and lasting aesthetic harmony with your space.

view our products

Get in Touch

Ready to Start Your Project?

Get in touch with our team to discuss your installation requirements and find the right solution for your space.